We Framed the Exterior Walls in 5 Days | Lake House Build Ep. 7

 Now that we have a floor, we are ready to build out and raise the load bearing walls! We have some pretty big beams to give strength for wide openings, so we get the A-Team together along with a handy material lift to raise the walls in place. Check it out in the video below. 




Comments